Your Shopping Cart
ESTIMATING THE FIRST MELTING TEMPERATURE OF FIRESIDE DEPOSITS IN RECOVERY BOILERS

Provider: TAPPI
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$35.00
Product Details
- The first melting temperature (FMT) of fireside deposits is important in recovery boiler operation. Corrosion of superheater tubes occurs rapidly if tube surface temperatures exceed the FMT of the deposits on the tubes.
- This TIP summarizes available information on the effects of deposit composition on FMT, and shows how to estimate the FMT based on deposit composition.
- This TIP summarizes available information on the effect of composition on the FMT, and shows how to estimate the FMT from deposit composition.
It Provides information on:
- Scope.
- Content.
- Keywords.
It Benefits:
- Engineer.
- Laboratory Personal.
- Analyst.
- Researchers.
Customers Also Bought
- VISCOSITY OF SODIUM CARBONATE SOLUTION
Price: $35 BUY NOW - DENSITY OF AQUEOUS SODIUM SULFITE SOLUTION
Price: $35 BUY NOW - SULFITE WASTE LIQUOR CONCENTRATION
Price: $35 BUY NOW - BOILING POINT RISE OF SPENT SULFITE LIQUORS
Price: $35 BUY NOW - VISCOSITIES OF VARIOUS SPENT SULFITE LIQUORS AT 26.7 DEGREES CELCIUS AND OTHER TEMPERATURES
Price: $35 BUY NOW - VISCOSITY OF A NEUTRAL SULFITE SPENT LIQUOR (OSTWALD CAPILLARY VISCOMETER)
Price: $35 BUY NOW
You Recently Viewed